Bỏ qua tới nội dung

Design · Build · FDI Offices

An office built to FDI standards,
handed over on schedule.

AIC controls materials, engineering and QC through workshops of its own. BOQ quote in 4 working hours, bilingual VN–EN documentation.

VCBS · Bitexco Financial Tower · HCMC

— 01 —

10 yrs

In business (since 2016)

60–100

Projects delivered / year

4 h

Working hours to a BOQ quote

9

FDI & major clients

01 — Positioning

A fit-out contractor fluent in FDI standards — from bilingual documentation to fire-safety acceptance.

FDI clients need a contractor who speaks their technical language: shop drawings done to standard, a schedule that matches the factory ramp-up plan, and an itemised estimate that does not creep mid-project. AIC controls the whole chain — materials, fabrication, installation and QC — through two workshops of its own, instead of subcontracting it away.

Trusted by

POSCO
Sheraton
Otsuka
Realtek
CMC Global
DHA Corporation
Droppii
AHaSoft
Blue Origin
Pocari Sweat
THP Group
Nguyễn Kim
D'Homme
Tokyo AA
OH!SOME
Agribank
SwanBay
Dentium
Vietpearl
Son Kim

Selected clients — FDI corporations from Korea, Japan and Singapore, and leading Vietnamese enterprises that have chosen AIC for their workspaces.

Process

From drawings to handover — transparent at every step

01

Survey & bilingual brief

Site measurement, FDI requirements and your factory ramp-up schedule made explicit up front.

Site survey · VN/EN brief · fire-safety + MEP checklist

02

Transparent BOQ in 4 hours

A detailed per-m² bill of quantities, scope agreed before work starts — price locked to the signed scope.

Take-off from drawings · bilingual quote · variations only when scope changes, agreed in advance

03

Technical design & shop drawings

2D layouts, 3D visuals and construction drawings ready for your internal approval process.

2D layout · 3D · MEP/HVAC shop drawings

04

Controlled fabrication & site works

Joinery produced in our 1,200m² workshop and quality-checked before it reaches site.

In-house fabrication · workshop QC · site supervision

05

Acceptance & warranty

On-schedule handover, warranty of up to 24 months with 3 scheduled maintenance visits.

Bilingual acceptance dossier · Warranty of up to 24 months · maintenance months 3·6·9

Send drawings → BOQ in 4 hours

Quality control

"Joinery and finishes are made in our own workshops — we control the part that decides quality."

VCBS · Bitexco Financial Tower · staff amenity area

— 02 —

Capability

Depth enough for Grade A offices

Materials & finishes under control

Ceilings, flooring, partitions and joinery fabricated at AIC workshops — each package quality-checked before site installation.

Made in-house

Coordinated MEP

Power, lighting, data and plumbing coordinated through shop drawings and integrated correctly with base-building systems.

Licensed partners · AIC as GC + QC

HVAC — cooling & ventilation

Cooling loads engineered around real occupancy density — efficient operation for high-headcount offices.

Licensed partners · AIC as GC + QC

Fire safety (PCCC) & acceptance

Statutory fire-safety works and acceptance dossier coordinated with licensed specialists — compliant for high-rise towers and industrial parks.

Licensed partners · AIC as GC + QC

Collections by type

Office design guides by format

Grade A towers, FDI offices, coworking, renovation — each has its own playbook. Explore the guide for your format.

AIC production capability

Made in-house

The core of every project is produced by AIC

Joinery and finishes — the items that decide aesthetics and durability — are fabricated in AIC's two workshops, not subcontracted out. For specialist packages (MEP, fire safety) AIC works with licensed partner contractors while remaining General Contractor and QC throughout — one accountable point of contact for schedule and quality.

1,200

Fabrication workshop

600

Workshop + office

5 floors

Showroom

Investment

Compare investment levels by grade

Per-m² rates — clear from the start about what is included and what is optional. The FDI Grade A− tier fits most FDI factory offices.

Standard Grade B+ from 4 +
Ceiling · flooring · partitions · paint
Lighting · small power · data outlets
Joinery made at AIC workshops Essential
Coordinated MEP with shop drawings
HVAC with cooling-load calculation
Fire safety (PCCC) works + acceptance dossier
Licensed MEP / fire-safety partners · AIC as GC + QC
BOQ quote in 4 working hours
Bilingual VN–EN documentation
Price locked to signed scope (changes = agreed addendum)
Warranty of up to 24 months + 3 maintenance visits
Single point of responsibility (GC + QC)
Get a BOQ
FDI factory office Grade A− 5–8 +
Ceiling · flooring · partitions · paint
Lighting · small power · data outlets
Joinery made at AIC workshops Full
Coordinated MEP with shop drawings
HVAC with cooling-load calculation Load calc
Fire safety (PCCC) works + acceptance dossier Coordinated
Licensed MEP / fire-safety partners · AIC as GC + QC
BOQ quote in 4 working hours
Bilingual VN–EN documentation
Price locked to signed scope (changes = agreed addendum)
Warranty of up to 24 months + 3 maintenance visits
Single point of responsibility (GC + QC)
Get a BOQ
Grade A premium High-rise towers 8–12 +
Ceiling · flooring · partitions · paint
Lighting · small power · data outlets
Joinery made at AIC workshops Premium
Coordinated MEP with shop drawings
HVAC with cooling-load calculation Full
Fire safety (PCCC) works + acceptance dossier Full review
Licensed MEP / fire-safety partners · AIC as GC + QC
BOQ quote in 4 working hours
Bilingual VN–EN documentation
Price locked to signed scope (changes = agreed addendum)
Warranty of up to 24 months + 3 maintenance visits
Single point of responsibility (GC + QC)
Get a BOQ

Indicative rates, excluding specialist items and VAT. A detailed BOQ follows your drawings and site survey — within 4 working hours.

Payment

Progress-based payments — transparent at every milestone

Payments are split into instalments tied to actual acceptance milestones — never a single lump sum. The number of instalments and the percentages are stated in each project contract and agreed before signing.

  1. 01

    20–30%

    Advance on contract signing

    Mobilises the project — materials ordered, site team scheduled, workshop production booked.

  2. 02

    Per milestone

    Progress payments

    Instalments tied to acceptance of each completed stage — never one bulk acceptance at the end.

  3. 03

    At handover

    Acceptance & handover

    Handover payment after acceptance passes, together with the bilingual as-built dossier.

  4. 04

    ~5%

    Warranty retention

    Retention released after the warranty period ends.

The percentages above are typical examples — adjusted to project size and schedule, and fixed in each project contract. All terms are stated transparently in the bilingual VN–EN BOQ and contract.

FAQ

Quick answers

Didn't find your answer? Our team responds directly during business hours (GMT+7).

Talk to our team

+84 906 330 288

Get a BOQ in 4 hours
Is a BOQ quote in 4 hours realistic?+

Yes. Once you send drawings, AIC produces an itemised bill of quantities within 4 working hours — so procurement can keep to its schedule.

Do you provide bilingual documentation for FDI clients?+

Yes — every BOQ, contract and construction drawing set is issued in both Vietnamese and English.

What does the warranty cover?+

A warranty of up to 24 months plus three scheduled maintenance visits in months 3, 6 and 9 after handover.

Which locations does AIC serve?+

Headquartered in Ho Chi Minh City, AIC fits out FDI factory offices across the Dong Nai, Binh Duong and Bac Ninh industrial parks and surrounding provinces.

Do the per-m² rates include MEP and fire safety?+

The Standard (Grade B+) tier covers finishing plus lighting and small power. Coordinated MEP, HVAC and fire safety are separate packages — included from the FDI Grade A− tier — and quoted from actual drawings. Specialist works are executed by licensed partner contractors, while AIC remains General Contractor and QC: one point of responsibility.

Start here

Send your drawings — receive a BOQ within 4 working hours.

Bilingual documentation, a predictable schedule, and quality controlled from workshop to handover.

Response during business hours (GMT+7) · no spam

Project type

Call Zalo Message Get a quote
Zalo