Your factory is 8–12m tall but only the first 4m earns money — the rest is rented volume doing nothing. A mezzanine turns that air into offices or light storage at a fraction of the cost of renting more floor.

What makes it different

Warehouse mezzanine floors — get it right from design

A mezzanine is a structural problem before it's an interiors one: what live load per square metre, where columns can land without blocking forklifts and lines below, whether the existing slab takes the transferred loads, and how the new floor affects the approved fire-safety scheme. AIC starts with a structural survey and answers those questions with numbers before drawing schemes. The structure itself is prefabricated steel, bolt-assembled on site — fast, with minimal hot works inside an operating facility — finished above as a glazed office or light storage as needed.

Warehouse mezzanine floors

Done right

The items that decide quality

Load-rated for the real use

Offices need ~300kg/m², light storage 500–750kg/m², racked storage more — declare the true purpose upfront so the structure is neither wastefully heavy nor dangerously light.

Column positions and the slab below

Mezzanine columns must dodge forklift routes and production lines, while the existing slab must take the concentrated loads — two constraints that set the span and the steel price.

Prefabricated, bolt-together steel

Frames are fabricated in the workshop and bolted on site — minimal welding inside an operating plant, and roughly half the schedule of cast concrete.

Fire safety when adding a floor

A mezzanine changes floor area and escape routes in the approved fire file — check against current regulations and update the scheme before building, or fail inspection later.

Stairs, guardrails and goods lifting

Stairs follow people flow, guardrails meet industrial safety standards; storage mezzanines need pallet gates or a lift position — cheap now, expensive to retrofit.

Power, lighting and cooling upstairs

A mezzanine office needs its own air-conditioning and lighting, cabled from the main board — designed with the structure so nobody drills through the new floor later.

Reference spaces

Design directions

Warehouse mezzanine floors
Warehouse mezzanine floors
Warehouse mezzanine floors
Warehouse mezzanine floors
Warehouse mezzanine floors
Warehouse mezzanine floors

Download the Industrial portfolio & company profile

Fill in your details — get the segment portfolio and AIC company profile 2026 (PDF)

  • Office Portfolio 2026 — English
  • Company Profile 2026 — English

No spam · used only to send documents & follow up

Frequently asked questions

Warehouse mezzanine floors

Does a mezzanine need a permit?

In most cases yes: a mezzanine adds usable floor area, touching both building-permit and fire-safety requirements under current regulations. AIC advises on your facility's specific legal position and prepares the paperwork.

Mezzanine cost versus renting more space?

A finished office mezzanine typically runs VND 2.5–4.5 million per m² — paid once, used for years — while extra rented space bills monthly plus dual-site operating costs. For 100–500m² of extra need, the mezzanine usually wins within 12–18 months.

How long does it take, and does the plant stop?

A 200–400m² steel frame assembles in 2–3 weeks, with 3–4 more weeks for the office above. The work zone is hoarded and noisy anchor-drilling runs off-shift — the plant operates normally outside the hoarding.

Start with a detailed BOQ.

Send us your floor plan — AIC prepares a detailed BOQ in about 4 working hours, with locked pricing and handover milestones in the contract.